NASA ISS On-Orbit Status 19 January 2015

Today: External Thermal Control System (ETCS) Loop B Recovery Status: Over the weekend, ground teams finished repressurizing and recovering ETCS Loop B and the systems which were deactivated as a result of Wednesday’s safeing response. The Loop B Interface Heat Exchangers (IFHX) have been reintegrated, which allows internal heat rejection on Loop B.

—> Read More Here


Leave a Reply

Your email address will not be published. Required fields are marked *