NASA ISS On-Orbit Status 24 December 2014

Today: Rodent Research: Crew powered down, removed and prepared the Rodent Research habitat for stow. At the conclusion of Rodent research-1 operations, Habitat -2 was positioned in several locations (EXPRESS Rack 1 (ER1), ER2 and Aisle deploy) to thermally characterize areas within the US Lab in preparation for future Rodent Research operations.

—> Read More Here


Leave a Reply

Your email address will not be published. Required fields are marked *